Condensing Steam Turbine Peter Brotherhood Ltd. (England) Power Output – 3500 kW Normal Running Speed – 7035 RPM Trip Speed – 7739/8090 RPM Steam Inlet Pressure – 40 bar G Steam Inlet Temperature – 480° C Exhaust Pressure - 0.10 bar A
TO WHOM AT MAY CONCERN ; WE VE NEW UNUSED 3 SETS NAPIER NA 307 GAS INLET& OUTLET CASINGS AND INLET ELBOWS AT OUR STOCK. 3 SETS GAS INLET & OUTLET CASINGS ARE NEW AND NEVER MONTAGED . PLS REFER SOME PICTURES ON ATTACHE IF YOU VE ANY QUESTIONS . PLS DO NOT HESITATE TO CONTACT WITH US . Capt. Ayhan Ugurluba With Kind Regards ; Aliaga Marine Services E mail: info/aliagamarine.com Phn/Fax:+90 232 618 03 90 Mobile: +905556084850 aliagamarine.com TURKEY
1 piece ABB TPL 77-B12 turbocharger complete available New In our stock in Istanbul Please contact: info@fin-marine
Complete 96 MWe gas fired black start/ peak load power station, consisting of 4 (four) GE Frame 5N Gas Turbine Sets 24 MW each. Each set consists of a: • Gasturbine • Generator • Diesel Engine • Main Gearbox • Auxiliary Gearbox • Speedtronic Mark II control system • Exhaust plenum • Air inlet filter house 125 MVA transformer With or without building. additional info on request.
The combined cycle plant consists of a gas turbine, waste heat recovery boiler, steamturbine and a generator, mounted in a single shaft configuration. The capacity of the installation is 53 MW • The prime mover of the installation is an aero derivative General Electric LM6000-PB-DLE. 40 MW - 30,000 hours remaining till next major overhaul - Running hours 74.100 hours , start 3356 - Next overhaul in 5000 hours(hot gas path) - Next major overhaul: in 30.000 hours • The Steam Turbine is a SIEMENS ENK40/53-3, with a capacity of 13 MWe. Dismantled, stored and ready for transport.
2 used steam turbine units available: 1. Type: B5 S2 + G IV Year: 1991 Turbine output: 294 kW at 1.35 bar and 170 C With exhaust gas heat exchanger 2. Type: B5 S3 + G IV Year: 1992 Turbine output: 330 kW at 1.35 bar and 170 C With exhaust gas heat exchanger Subject to prior sale - Errors possible
Dresser-Rand steam turbine (new price 2.8 million EUR), unused and as good as new - built 2009 - inlet steam stream 53,000 kg/h - 1 generator type Syn. 3 phases - 60 Hz, 12.3 MW - 4,500 rqm / 1,800 rqm - gearbox RENK type TL-500, BJ. 2009, GEA surface capacitor, type 2/III/H, BJ 2007, 2 condensate pumps type Etanorm G080-400 G11, BJ 2007
Turbine Nadrowski Superheated steam turbine Brand turbine factory Nadrowski Type B 5 S4+GIV/V Year of construction: 1989 for generating electricity from superheated steam Maximum steam temperature 400°C Working pressure 4-31 bar Maximum power 632 kW with Synchronous Generator AVK DKBN 100K/800-4 Power 813kVA, current 1173 A regularly serviced External dimensions approx. L 4 m x W 1.50 m x H 1.50 m
Pratt & Whitney gas turbine generator Model : FT8 Twin pac Power output : 48 MW Voltage : 11 KV Frequency : 50 Hz
Hydroelectric power station - Power: 1000 KvA composed of: 1 turbine Francis/ useful slope 31.7m, water volume 3'500 l/s, manufacturer; Hugal 1 piece generator power 1'000 KvA 1 piece ball slider
Hydropower - Power: 240 kW consisting of: 1 piece turbine Pelton/ paygap 225m, water quantity 130 l/s, manufacturer; Escher-Wyss 1 piece generator power 240 kW, manufacturer; Barthold
SIEMENS SGT400 gas turbine generator, CCGT Model : SGT400 Rated power : 14.3 MWe at ISO condition Voltage : 11KV Frequency : 50Hz Running hour : GT#1 16026 hr ; 100 start ; GT#2 17357 hr ; 108 start
GE Model : LM6000PA Power Output : 42 MWe ISO condition Voltage : 11KV Frequency : 50Hz
Complete 48 MW Westinghouse W251-B11 Gas Turbine with a Brush electric generator, 3000 rpm, 50 HZ, 11.5 KV,
3 MW Siemens Steam Turbine SST-110 TWIN AFA 46 K Year: 2010 Hours: 5,200 Capacity: 3,224 kW Volts: 400 HZ: 50 Condition: Very Good Scope of Supply: Complete Turbine Power Station Turbine and alternator Control Panel Condensor Cooling Towers Spilling Unit Switchgear Synchronisation panel Transformer Piping / wiring / pumps Boiler not included Inspected in Very Good Condition. Dismantled and loaded to your transport .
Make and model: Turboden ORC Year: 2016 Electrical capacity: Ran at 700kW (Normal rating: 643 kW) V: 400 HZ: 50 Now available for sale. Price: 400,000 GBP
Turbogas Turbine GE5/1 5MW Natural gas for sale. Complete turbogas turbine plant with electric generator, recovery boiler and exchangers, dry cooler, diverter. Total Hours: 36,000 8,000 hours from the last overhaul. THERMAL POWER 9,0 MWt Saturated steam production 13,000 kg/h at 10BARg Voltage 11000 V Frequency 50 hZ Also available: - GE5/1 used turbine in nitrogen storage with 72,000 hours + 8,000 Hours after the last overhaul + one used generator. Price: €300,000 - NEW GE5 Turbine Spare Parts (value 1 million) Price: €400,000
Complet gas turbine GE LM 6000 RMUGG - 04 , low time work
TO WHOM IT MAY CONCERN WE VE NEW UNUSED GENUINE SPARE PARTS OF MAN NR 34S AT OUR STOCK. NEW BEARING BUSH 1151768-0353 517003 1PCS NEW LOCATING BEARING 1151768-0580 517002 1PCS NEW NOOZLK E RING IMO 3318 129.88cm3 1PCS NEW BEARING ASSY 5891812 30021F 8PCS ALL PARTS EX STOCK LOACTED AT IZMIR TURKEY. IF YOU VE ANY FURTHER QUESTIONS PLS DO NOT HESITATE TO CONTACT WITH US .
TO WHOM IT MAY CONCERN; WE VE NEW UNUSED GENUINE SPARE PARTS OF MAN TURBO NR 34S AT OUR STOCK. NEW SET OF SPARE PARTS 1159500-0138 2PCS NEW SET OF SPARE PARTS 1191468 1PCS NEW BEARING BUSH 1191468 7PCS NEW BEARING BUSH 1151768-0442 1PCS NEW NOOZLE RING IMO 2475 128.05cm3 2PCS NEW LABYRINTH RING 1191468 2PCS NEW LOCATING BEARING 1191468 2PCS NEW LOCATING BEARING 517002 1PCS ALL PARTS EX STOCK LOCATED AT IZMIR TURKEY. IF YOU VE ANY QUESTIONS . PLS DO NOT HESITATE TO CONTACT WITH US .